The recent escalation in fuel prices, associated with geopolitical instability in the Middle East and broader constraints across global oil supply markets, is now influencing construction delivery in a more pronounced way. This challenging environment is further exacerbated by New Zealand having no operational refining capability.
While fuel volatility has historically been absorbed within broader cost movements, the pace and scale of recent increases have altered that position. In New Zealand, diesel prices have increased significantly over a relatively brief period, with some datasets indicating rises approaching 100% between February and April 2026.[1][5] This is no longer a marginal fluctuation. It is an increasingly important input affecting how projects are priced, procured, and delivered, including within the wider context of macro-economic considerations inclusive of cost-of-living increases, inflation rates and wage pressure.
Fuel is no longer simply a background cost within construction. Fuels and associated petrochemical products are increasingly acting as a primary cost input influencing price rises for materials, logistics and subsequently programme concurrently.


A structural shift in cost drivers
The construction sector’s exposure to fuel is both direct and embedded. Diesel remains fundamental to site-based activities such as earthworks, piling, cranage and temporary power generation, meaning cost movement in these areas can be immediate.
However, the more significant shift is occurring within the supply chain. Various data sources provide for substantial increases reflecting the circa 40% increase in fuels over a period of 6 weeks.
For example, Fletcher Building warns that “its plastics division faces price hikes of up to 36%” [6]. Rawlinsons Market Insight April 2026 indicates that “these pressures are being passed through rapidly, with limited capability for cost absorption within existing contractor margins”.
These alerts indicate material price escalation for products such as bitumen and asphalt, reinforcing and structural steel, aluminium cladding, concrete, quarry products and laminated timber products [7] glazing systems, glass and plastic based products including PVC and HDPE pipework are sensitive to energy inputs and petroleum derivatives. As a result, changes in fuel and energy markets are being reflected not only in transport costs, but also, to varying degrees, in the underlying price of materials themselves.
This dual exposure across both production and delivery means that fuel related and petrochemical product increases can accumulate across projects rather than presenting as a single identifiable cost movement. In response, the supply market is increasingly incorporating fuel related adjustments into pricing, whether through explicit surcharges or revised base rates.
Where the pressure is emerging in projects
At a project level, these effects are rarely experienced as a single event. Instead, they tend to present as a series of incremental movements across trades, procurement packages, and delivery conditions, which collectively influence the overall commercial position.
Recent Costbuilder data indicates that measurable increases have been observed across elements such as site preparation, substructure and excavation rates within relatively short reporting periods, reflecting the sensitivity of these activities to diesel pricing.[2][4] While such movements may appear modest in isolation, their cumulative effect can be material.
At the same time, pricing volatility is becoming more evident. Supplier quotations are, invariably being held for shorter periods and pricing is increasingly subject to review where input costs remain uncertain. Procurement strategies are having to adapt to this revised purchasing environment.
These issues are also intersecting with broader supply chain considerations. Ongoing tensions affecting key global shipping routes, including the Strait of Hormuz, highlight the exposure of construction supply chains to external disruption. Alongside this, evolving government responses such as the National Fuel Plan introduce an additional layer of uncertainty. While New Zealand is currently operating in a watchful phase, more restrictive measures, particularly those prioritising fuel allocation to critical services, remain a potential scenario.[3]
In practical terms, this creates a combined effect of cost pressure and potential supply constraint, with implications for both pricing and programme depending on project specific circumstances.
Translating market movement into project impact
While the impacts of fuel uncertainty are not currently being felt within the New Zealand Producer Price Indices for the quarter ending March 2026, it is anticipated that the inflationary impacts will be prevalent in the subsequent June 2026 quarter and result in an uplift in the inflation rate.
That is, understanding the extent of fuel related escalation requires more than a single point adjustment. The impact does not typically sit within one trade or cost category. Instead, it develops across plant, materials, logistics and may also result in detrimental impacts on the construction programme.
In practice, this is identified through movement over time, requiring comparison between original allowances and forecast escalation assumptions, current supplier pricing, earlier tenders and revised submissions and historic rates against prevailing market conditions. This layered assessment is often necessary to form a reliable view of cost movement at project level.
The movement of cargo restrictions consequent upon the instability experienced in the Middle East has potential project programme implications. Where material availability or delivery timing is affected, this can influence procurement sequencing and, in turn, aspects of programme delivery, although the extent of this will vary by project.
Establishing a robust causally linked analysis relies on an assessment of available and completeness of information sources. That is, robust outcomes are typically supported by contemporaneous records which connect changes in market conditions to supplier response and project consequence. The information sources may include supplier quotations, freight and fuel related adjustments, historic rate benchmarks and broader market indices across fuel and associated petrochemical products, metals, and plastics, supported by procurement and programme records where relevant.
Commercial management and substantiating impact
As fuel driven cost pressure becomes more embedded across construction delivery and the wider economy, the focus is increasingly shifting toward how projects manage and substantiate change in real time.
In practice, this is less about formal dispute mechanisms and more about disciplined contract and cost management during project delivery. The ability to clearly demonstrate the link between market movement and project impact is central to maintaining commercial clarity between parties.
This typically requires consistent tracking of changes across supplier pricing, freight and logistics adjustments and material cost movements. Increasingly, contemporaneous records are being used to build a clear picture of how external market conditions are flowing through to project outcomes.
From a practical standpoint, the strength of any assessment is not determined by a single document or data point. A robust analysis is built through a multiplicity of information sources. This may include, but is not limited to, supplier correspondence showing price movement, updated quotations, cost plan revisions and supporting market indices for key inputs such as fuel, metals, and plastics.
When this assessment is implemented effectively, projects can demonstrate a clear and logical progression from market conditions through to procurement response and eventual cost outcome. This reduces ambiguity and supports more structured commercial decision making as projects progress through volatile conditions.
Positioning for response
What is emerging is not simply a cost increase, but a shift in how fuel related risk is considered within construction delivery.
Where it was once largely implicit, it is now more frequently being recognised, assessed and, in some cases, explicitly reflected in pricing and procurement strategies. This is influencing behaviour across the market, with risk more actively considered during procurement and more clearly articulated in commercial discussions between project participants.
The degree of exposure will vary depending on factors such as contract structure, timing of procurement and the composition of the supply chain. However, the broader trend indicates that fuel related inputs are becoming a more visible component of project cost and risk.
The challenge is not only identifying that costs are moving, but understanding how those movements form, where they sit within a project and how they can be clearly demonstrated in a structured and supportable way.
SJA continues to work across projects to provide that clarity, combining market awareness with technical cost analysis to support informed decision making in an evolving environment. This is a functional output derived from our experience with mechanisms such as fuel adjustment clauses, provisional sums or indexed escalation formulas linked to recognised fuel benchmarks. The benefits being project teams are able to incorporate fuel fluctuations at either tender stage or during delivery to improves price realism, reduce the likelihood of disputes in support of more sustainable contracting operation by either avoiding the need to recover unforeseen costs for future projects or providing a robust analysis in support of claims for adjustments to the contract sum and the date for completion in respect of current projects.
SJA welcome the opportunity to share practical insights and discuss how these lessons learned may apply to your projects.
References
[1] Figure.nz – Fuel price data https://figure.nz/chart/lSYJzICrinllOY7p
[2] QV Costbuilder 2026 Q1.3 update https://costbuilder.qv.co.nz/data-updates/2026-q13/
[3] New Zealand Government – National Fuel Plan factsheets https://www.beehive.govt.nz/sites/default/files/2026-03/Fuel%20Response%20Plan%20factsheets.pdf
[4] QV Costbuilder 2026 Q1.3 detailed rates and cost planning data QV CostBuilder – NZ’s Comprehensive Construction Cost Database
[5] MBIE – Weekly fuel price monitoring data Weekly fuel price monitoring | Ministry of Business, Innovation & Employment
[6] Fletcher Building warns its plastics division faces price hikes of up to 36% – NZ Herald
[7] Rawlinsons Market Insights Report – Australian Construction Insights